Hartt Transportation Systems, a national dry goods carrier based in Bangor, Maine, outgrew its aging Lewiston, Maine facility. It turned to Hebert Construction to construct a new, 32,000 sf state-of-the-art facility to meet its growing demands. When Hebert invited us to submit a design-build proposal, we partnered with Harriman Engineers to develop preliminary drawings.
The project consisted of several electricians, who installed infrastructure for a future generator, complete interior and exterior LED lighting, and exterior receptacles on poles to allow trucks to easily access power overnight.
Featured Aspects of the Project
- Preliminary design concepts
- Engineering services
- Site-wide LED lighting package
- Outlets on light posts for overnight truck drivers
- Set up infrastructure for future generator